Friday, June 9, 2017

Problem solving in Asheville with R-Trac & ALPOLIC® materials

When new energy codes requiring continuous insulation for the building envelope were adopted by the state of North Carolina, the developers of the recently opened Asheville City Center sought out a cost-effective design that met code requirements while still allowing the building to feel open from the outside.

No comments:

Post a Comment